Labconco PuriCare Procedure Stations 38100 User Manual

Page 7

Advertising
background image

Product Service 1-800-522-7658

2









C

C

h

h

a

a

p

p

t

t

e

e

r

r

2

2

:

:

P

P

r

r

e

e

r

r

e

e

q

q

u

u

i

i

s

s

i

i

t

t

e

e

s

s

Before you install the Procedure Station, you need to prepare the site for
installation. Carefully examine the location where you intend to install the
cabinet. You must be certain that the area is level and of solid construction.
In addition, a dedicated source of electrical power must be located near the
installation site.

Carefully read this chapter to learn:

• Location requirements.

• Electrical power requirements.

• Exhaust requirements.

• Service utility requirements.

• Space requirements.

Refer to Appendix C: Specifications, for complete electrical and environmental
conditions, specifications and requirements.

Space Requirements

The dimensions for the different models are shown in Appendix B:
Dimensions.

Clearance

Procedure Stations that exhaust their filtered air back into the room should
have at least six inches (150 mm) clearance from any overhead obstructions
when the cabinet is in its final operating position. A clearance of at least 6
inches (150 mm) should be maintained on both sides of the cabinet, as well as
12 inches behind the unit.

Advertising
This manual is related to the following products: