Conduit, Conduit -4 – Gasboy 9800Q Series User Manual

Page 38

Advertising
background image

Wiring

Page 5-4 MDE-4340A Series 9800Q Pumps and Dispensers Installation/Operation Manual · January 2006

The DC wire for RS-232 and RS-422 lines for connection to a TopKAT are described in The
TopKAT Installation Manual.

115 VOLT WIRE GUAGE SIZES PER FEET/METERS OF RUN

FEET
METERS
MOTOR HP

25’
8m

50’
15m

100’
31m

150’
46m

200’
61m

250’
76m

300’
91m

OVER 300’ (91cm) USE RELAY
AT MOTOR LOCATION

1/2

14

12

10

8

8

8

8

3/4

14

12

10

8

6

6

4

230VOLT

1/2

14

12

12

12

10

10

10

3/4

14

12

12

10

10

10

8

1/1/2

12

12

10

10

8

8

6

Conduit

All wiring to the Gasboy Series 9800Q dispensing unit must be installed in threaded, rigid,

metal conduit. PVC is not acceptable. When the Series 9800Q dispensing unit is used with a

Gasboy Fuel Management System, it is recommended that AC power wires be installed in a

separate conduit from the DC wires; they should not run in any sort of common conduit or

trough. However, if AC and DC power wires share conduit, DC wiring must use the cable as

specified in

“Pulse Output or RS-485 Wiring” on page 5-5

. Wiring between a Fuel Point

Reader (FPR) and its pre-amp junction box is intrinsically safe and must be run in a conduit

with only other intrinsically safe wiring. It cannot be run in conduit with AC, DC, RS-485, or

pulser wiring, regardless of the cable type used. See the Fuel Point Reader Installation and

Retrofit Instructions Manual, C35628 for details.

When using a Fuel Management System other than a Gasboy system, see the manufacturer's

installation manual for specific conduit requirements. All wiring and conduit runs must also

conform with the National Electrical Code (NFPA 70) and the Automotive and Marine

Service Station Code (NFPA 30A). All wiring and conduit runs must conform to local codes.

Canadian users must also comply with the Canadian Electrical Code.

Use the charts below as a guideline to determine the proper conduit sizes for the Gasboy Series
9800Q dispensing unit. When planning the orientation of the wiring runs, follow the
applicable Gasboy wiring diagram and consider the layout of the components at the site. Long
runs or a large number of bends may require you to increase conduit size over what is listed.

THHN/THWN Wire Areas

Gauge


Diameter
in mm


Area (Sq Units)
in mm

18

.090

2.29

.007

4.1

16

.104

2.64

.009

5.5

14

.118

2.95

.011

6.8

12

.135

3.43

.014

9.2

10

.169

4.29

.022

14.5

8

.216

5.49

0.37

23.7

.259

6.60

0.53

34.2

Advertising