MDE-4556 Gasboy ATC Kits M06875K00X Installation Manual • July 2006

Page 7

Installation

Installation

Preparing Site and Dispenser for ATC Option

1

Record all electronic and mechanical totals.

2

Isolate each unit to have ATC kit installed at distribution box.

3

Open door to hydraulics area.

4

Turn off (close) shear valve.

5

Test shear valve for proper closure by activating fueling position nozzle and verifying no flow
occurs.

6

Turn OFF associated STP circuit breakers for the unit(s) being upgraded.
This may require multiple STP disconnects.

7

Turn OFF all power to unit at system circuit breaker, including unit lights.

8

Disconnect power cable to the following boards:

• M05200A001 Retail Pulse Out
• T20011-G1 Pump Controller

9

Turn off system battery by pressing CLEAR then ENTER on manager keypad.

10

Tag shear valve according to OSHA lock-out and tag-out requirements.

Installing Filter Manifold and Probe

The kit parts used in this section are:

• M04607B003 2-Stage Solenoid Valve and Filter Manifold with Probe Port
• Q10068-09 O-Ring, 1.234-inch I.D.
• Q10068-14 O-Ring, 1.609-inch I.D.
• Q13130-01 Thermowell, Meter Cover
• Q13131-01 RTD Probe Assembly
• R19457 High-Capacity Strainer Insert

1

Remove filter from current M04607B001 Valve and Filter Manifold.

Maintaining power to the boards during installation could result in board failures. Do not rely on the circuit
breakers to disconnect power to the boards.

CAUTION

Residual pressure may exist in the hydraulic system. Wear eye protection.

WARNING

!