Figure 14, Caution – Gasboy 03908X User Manual
Page 17

MDE-4351A Gasboy ATC Kits 039086 and 039087 Installation Manual • February 2006
Page 17
Installation
Figure 14: Mounting the IS Barrier on the Shelf
5
Place the wires extending from the mounting stud through the mounting hole in the dual probe
connector assembly and place the connector assembly up on the stud (underneath the shelf).
6
Place the washer and nut over the wires and turn nut onto the stud securing the IS barrier and
probe connector. Tighten snugly but do not overtighten.
7
Place the wires extending from the top of the IS barrier up through the grommet in the upper
shelf as shown in
IS Barrier
Probe Connector
Assembly
Notch in Shelf
If your kit contains the newer version of the 218Y00 IS Barrier (see
for
identification) and your unit does NOT have the notch in the shelf (
), the IS
barrier will not mount. DO NOT try to mount the IS barrier if the shelf does not have the
notch.
CAUTION