Pump control expmux cpu board – Gasboy CFN Series Site Controller III Start-up User Manual
Page 47
Advertising

MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008
Page 41
PCU
Jumpers and Switch Settings
PCU
shows the PCU layout. Refer to this layout when performing steps
through
under
“Pump Control EXPMUX CPU Board”
Figure 6-3: PCU Component Location
Pump Control EXPMUX CPU Board
1
Unlock and open the front door of the PCU.
2
Ensure that all override switches are in the AUTO position. Refer to
.
3
Ensure that the AC power and battery switches, located in the upper righthand corner of the
power supply are turned OFF (down).
Advertising
This manual is related to the following products: