Pump control expmux cpu board – Gasboy CFN Series Site Controller III Start-up User Manual

Page 47

Advertising
background image

MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008

Page 41

PCU

Jumpers and Switch Settings

PCU

Figure 6-3

shows the PCU layout. Refer to this layout when performing steps

1

through

5

under

“Pump Control EXPMUX CPU Board”

.

Figure 6-3: PCU Component Location

Pump Control EXPMUX CPU Board

1

Unlock and open the front door of the PCU.

2

Ensure that all override switches are in the AUTO position. Refer to

Figure 6-3

.

3

Ensure that the AC power and battery switches, located in the upper righthand corner of the
power supply are turned OFF (down).

Advertising
This manual is related to the following products: