Start Up | 34

Installation Check

Before turning on power to the SE, inspect the installation to insure that it was carried out
correctly. Refer to Figure 35: Installation Check, to the SETC/P Pre-Start Up Checklist on page
41, and to the chapter on Installation that starts on page 9.










Figure 35: Installation Check

Steam Line

- Adequate slope

- No restrictions

- No kinks (hose)

- Condensate traps

on long runs

P Trap(s)

.

.

with 12 in

(30 cm) min drop(s)
.

Disconnect

,

,

Correct voltage

amps phase

On/Off Controls

(Air Proving)

in series between

terminal 1 and 2

Min 10 ft (3 m)

Control
- Wired to terminal 4.
- On/Off in series

between terminal
1 and 2.

- In return duct or

location which
represents humidified

space (no drafts,

not by door, not
by diffuser).

1/2 in line min
30-80 PSI

Not plastic drain,
Not to sink.

High Limit

- Wired to terminal 5

- On/Off in series

between terminal

1 and 2

Mounting
- Unit level
- Service clearance
- Properly anchored
if on stand

Spec label

Calculated absorption distance

to any obstruction or 8 - 10 ft

(2.4 - 3 m) if unknown.

2 x duct height

from fan or

transition

Boiler Condensate

- Gravity fed to boiler

or lift pump

Air gap

Boiler Steam
- Max 15 psi
- Safety valve if from
med. or high press.
boiler.
- Design pressure
at 100% demand.

Actuator,
- Opens CV Valve
fully at 100%

demand

- Closes fully at 0%.