Setting up your pt-link ii, Pt-link ii bacnet, Technical guide pt-link ii interface 4 – Orion System PT-Link II BACnet2 User Manual
Page 4: Quick guide, Figure 1: pt-link ii bacnet, Dimensions and components

PT-Link II BACnet
®
Technical Guide
PT-Link II Interface
4
Setting Up Your PT-Link II
Figure 1: PT-Link II BACnet
®
Dimensions and Components
485
DRIVER
COMM
R
SH
T
LOOP
PROTO
LED1
LED2
TIMER
W_DOG
H-BEAT
POWER
MADE IN USA
4.82
4.70
0.27
4.31
1.31
2.61
4.25
2.37
0.20 Dia.
Mounting Hole
Typ. 3 PL.
BACnet
®
Communications
Wiring Terminal
Local Loop
Communications
Wiring Terminal
Local Loop
Communications
Driver Chip
24 VAC Power
Terminal
Communications
LED
Diagnostic
LED #1
Diagnostic
LED #2
BACnet
®
Protocessor
Module
Power
LED
USB
Port
Ethernet
Port
www.orioncontrols.com
WattMaster Label
#LB102082
Rev. 01A
OE368-23B-BACNET
PT-LINK II PROTOCOL
TRANSLATOR
FOR BACNET
+24
VAC
GND
LOOP
LED 1
LED 2
=RAPID BLINK
=BLINKS QTY
CONTROLLERS
= STEADY BLINK
PROTO
TIMER
WATCH DOG
H-BEAT
=RAPID BLINK
= STEADY BLINK
= ON SOLID
= STEADY BLINK
LED BLINK CODES (NORMAL)
P
ROTO
C
E
SSO
R
Protocol
Copr
o
c
e
s
s
o
r
www.protoces
s
o
r.c
o
m
1
2
3
4
5
6
7
8
O
N
O
N
1
2
3
4
ON
RX
TX
RSGND
Configuration
DIP Switches
Quick Guide
The following steps will get you up and running in no time:
1.
Familiarize yourself with the PT-Link II components (Figure 1).
2.
Connect your PT-Link II to the Controller(s) on your system (up
to four) and connect your PT-Link II to the BACnet Network
(Figure 2).
3.
If the BACnet address doesn’t need to be any higher than 255,
then you can use the DIP switch settings to confi gure your PT-
Link II. Skip to page 9. Set the DIP Switches, wait 4 minutes,
and you’ll be up and running. If the address needs to be higher
than 255, or your BACnet module does not have DIP switches,
continue
with
Step 4.
4.
Copy the contents of the PT Link II CD to your PC’s Desktop.
You can also download the fi les from http://orioncontrols.com/
software-new.html under PT-Link II Setup Files. These fi les
include
RUINET.
5.
Connect your PT-Link II to your computer using an Ethernet
connection
(Figures 3 & 4).
6.
Change your PCs IP Address. Follow the directions that match
your current operating system - Windows NT, XP, Vista, or 7.
See directions on pages 7 & 8.
7.
Obtain the following from your Building Automation System
Integrator: the BACnet MAC address (System Node ID), your
server’s baud rate, and the Client Node ID.
8.
Using RUINET, edit the Confi g.csv fi le and verify PT Link II
communications. Follow the directions on pages 10-13.
9.
If you run into any problems, follow the instructions in the
Troubleshooting section starting on page 14 of this guide.
Revised 5/11/11