Installation, Pre-installation guidelines, Inspect package contents – Quintum Technologies Tenor Call Relay 60 User Manual

Page 29: Installation -2, Pre-installation guidelines -2, Inspect package contents -2

Advertising
background image

P/N480-0076-00-00

3-2

Chapter 3: Installation

Installation

Before you begin the actual installation, review the pre-installation guidelines which follow and
inspect the package contents.

Pre-Installation Guidelines

• Do not connect equipment in wet conditions and keep the unit away from dusty areas.

• The area must not exceed the temperature and humidity guidelines outlined in

Chapter 2:

Hardware Components

• Avoid exposing the unit to excessive vibrations.

• Mechanical loading of rack should be considered so that the rack remain stable and unlikely to

tip over. Ensure no equipment is put on top of the unit.

Inspect Package Contents

Before you install the hardware, ensure the following components are included in your shipment:

Tenor Call Relay 60 and Mounting Hardware

• 1 AC Power Cable

• DB-9 RS-232 Serial Cable

• RJ-45 LAN Cable

• Product Guide in CD format

If a listed component is not included in your package, contact your customer service representative.

Advertising