Seaward 300 PrimeTest User Manual

Page 37

Advertising
background image

PrimeTest 300

Operating Instructions

- 36 -

10.1.1 Asset ID

This can be set to automatically increment the ID
number at the end of each test, present a blank field or
Repeat Last ID.

10.1.2 Start Increment

This field sets the number from which the auto
incrementing asset ID begins counting.

10.1.3 On Test Failure

In the event of a test failure during an automatic
sequence, the PrimeTest 300 can be configured to
either End Test, which will terminate the test sequence
or Fail Menu, which will present a list options.

Fail Menu gives the option to
restart

the

test,

restart

the

appliance (from the first test), end
the appliance (and record a fail
result) or abort the appliance.

Note: Restart Test is useful for coping with

situations such as forgetting to connect the
earth continuity probe.
End Appliance will record a Fail result whereas
Abort Appliance does not record a result.

10.1.4 After Test

There is a choice of 4 actions to be carried out at the
end of a test sequence.

Advertising