Seaward 300 PrimeTest User Manual

Page 81

Advertising
background image

PrimeTest 300

Operating Instructions

- 80 -

14.0 Electrical Specifications

14.1 Earth Continuity

Test Current (2Ω load)

±200 mA

Test Circuit Voltage

± 4V min

Test Duration

2, 5, 10, 20, 30 seconds

Pass/Fail Limit

User Defined

Display Range

0.00 – 19.99Ω

Measuring Range

0.01 – 19.99Ω

Resolution

0.01Ω

Accuracy

± 5% ±2 digits

14.2 Insulation Resistance

Test Voltage Open Circuit

500V +20% / -0%

Test Voltage @ 1mA

500V min

Test Current Short Circuit

<2 mA

Test Duration

2, 5, 10, 20, 30 seconds

Pass/Fail Limit

User Defined

Display Ranges

0.00 – 1.99MΩ
2.0 – 19.9MΩ

20 – 199MΩ

Measuring Range

0.01 – 40MΩ

Resolution

0.01MΩ, 0.00 – 1.99MΩ

0.1MΩ,

2.0 – 19.9MΩ

1MΩ, 20 – 199MΩ

Accuracy

± 5% ±2 digits

14.3 IEC Lead Test

This is a 3 part test is made up of:

Earth Continuity – specification as 10.1 above.
Insulation Resistance – specification as 10.2 above.
Polarity Check – checks for: Live open

Neutral open
L/N Short
L/N reversed

Advertising