WattMaster WCC II User Manual

Page 242

Advertising
background image

Section 5: Installation Guide

WCC II Operator’s Guide

Operator Interfaces

5-40

TUC-VR Communication Wires

The TUC-VR communication wires must be installed in the
manner shown. That is, the communication wire must go from the
SAT II-B to the fi rst TUC-VR, from the fi rst to the second, the
second to the third, etc.

Advertising