SMA BEAM-BT-10 User Manual

Page 27

Advertising
background image

SMA Solar Technology AG

Commissioning

User Manual

BeamBT-BEN094911

27

Setting the NetID for your own Bluetooth PV system

During commissioning, the Sunny Beam will display the NetIDs of all PV systems with SMA Bluetooth
which are within its radio range. You then need to select the NetID of your Bluetooth PV system, as
described in the following:
34. Move the selection frame to the NetID of your own

Bluetooth PV system by turning the button.

35. Press the button.

☑ The Sunny Beam will establish a connection to your

Bluetooth PV system.

☑ The Sunny Beam then lists the serial numbers of the

detected inverters.

– If not all inverters of your Bluetooth PV system are

listed, or if inverters from other systems are listed,
please refer to section 12 "Troubleshooting"
(page 77).

Selecting the required inverters (only applies when more than 12 inverters are
available)

The Sunny Beam can only manage a maximum of 12 inverters. If your Bluetooth PV system comprises
more than 12 inverters, you must select the 12 inverters that you want the Sunny Beam to manage.
36. Press the button to select the inverters that are to be managed by the Sunny Beam.

selected
not selected