Installation, 1 hardware description, 1 switch front panel – PLANET WGSD-10020HP User Manual

Page 20

Advertising
background image

User’s Manual of WGSD-10020 Series

2. INSTALLATION

This section describes the hardware features and installation of the Managed Switch on the desktop or rack mount. For easier

management and control of the Managed Switch, familiarize yourself with its display indicators, and ports. Front panel

illustrations in this chapter display the unit LED indicators. Before connecting any network device to the Managed Switch, please

read this chapter completely.

2.1 Hardware Description

2.1.1 Switch Front Panel

The unit front panel provides a simple interface monitoring the switch.

Figure 2-1 and Figure

2-2

show the front panel of the

Managed Switches.

WGSD-10020 Front Panel

Figure 2-1

WGSD-10020 front panel.

WGSD-10020HP Front Panel

Figure 2-2

WGSD-10020HP front panel.

Gigabit TP interface

10/100/1000Base-T Copper, RJ45 Twist-Pair: Up to 100 meters.

SFP slots

100/1000Base-X mini-GBIC slot, SFP (Small Factor Pluggable) transceiver module: From 550 meters (Multi-mode fiber),

up to 10/30/50/70/120 kilometers (Single-mode fiber).

Reset button

On the left of the front panel, the reset button is designed to reboot the Managed Switch without turning off and on the

power. The following is the summary table of the reset button functions

:

20

Advertising