M R V C o m m u n i c a t i o n s , I n c . – I n s t a l l a t i o n M a n u a l

24

Infrastructure

The only infrastructure required for operating the transceiver and linking
the sites is Power and Data/Signal connection to the peripheral
networking equipment. This must be ready prior to the airlink installation

.

IN OUTDOOR INSTALLATIONS, USE SHIELDED AND
WEATHERPROOF MATERIALS (CABLES, INLETS, AND

CONNECTORS) COMPLIANT TO THE SAFETY STANDARD IN
FORCE.

Power

Source

The power requirement for standard units is 100-240VAC @

50/60Hz - 10W.

Note: Units requiring low Voltage: 24-60 VDC - 10W can be factory

set upon request.
It is recommended to use a Surge Suppression System to avoid

damage to the equipment when power supply is unstable.
Protection should be at least 25,000A.

Cabling

Standard 3-conductor power cords are required. (See Safety

requirements, Page iv)

Data/Signal Cabling

1. For TS700/155 , TS700/G, TS800/155 , TS800/155-F

Type

For connecting the Transceiver to the peripheral equipment, a dual-
fiber cable is required (one fiber for transmission, the other for

reception). The standard recommended cable is MM 62.5/125 µm
fiber or SM 9/125 µm for fiber.

Connectors
Each fiber should be terminated with the ordered type of connector

on the transceiver end (SC, ST).

Optical Fiber testing.

The cabling installer must specify the attenuation of each fiber
installed.