Installation completion, It is a cross connection: tx $ rx and rx $ tx – MRV Communications TERESCOPE TS800/155 User Manual
Page 54
M R V C o m m u n i c a t i o n s , I n c . – I n s t a l l a t i o n M a n u a l
44
Captive
Screws H
Link Operating Test
Set back the Mode Select Dip-Switch on the Normal position (the Alignment
indicator should switch OFF (if exists depending on the model)).
At both sites, connect with fiberoptic or STP cables coming from the peripheral
equipment to the fiberoptic or copper port of the transceiver.
IT IS A CROSS CONNECTION:
TX $RX AND RX
$ TX
The F/O RX Flag and Sync. (Electrical flag and Rx on TS700/100) indicators
should turn ON as soon as the peripheral equipment is powered ON.
A BER test is recommended. In case this is not possible at least check with the
customer/user the performance of the whole link (see the chapter Bench Test).
Installation Log
Write down all the information about the installation (including digital readout and
the setup of the transceivers) in an installation log. This information is a valuable
reference for future maintenance or troubleshooting visits.
An example of an installation form is shown in Appendix H.
Before Closing the Rear Door
1. Ensure that the Power Supply Cover is fastened in place.
2. All cables are properly held in position.
Visual Inspection
Visually check that all parts and cables are connected.
Closing the rear door
Rotate the Rear Door around the axis (I) and push it. Close the five screws H -
- see Figure 6.16.,
.
Installation Completion
Check that the heads appear as shown in the photographs below.
Fig. 6.16: Screws H and door axis
Door axis I