Operation, 0 scope, 1 start-up of a module – MGE UPS Systems GALAXY PW 225KVA User Manual

Page 49: 1 start-up of an inverter, 2 emergency power off (epo)

Advertising
background image

Operation

4.0

Scope

Operation describes the start-up for single and parallel units, modes of operation, normal specifications for operating
the Galaxy PW™ 100 to 225kVA, including display messages, measurement systems, alarms, batteries, and log
time stamping operations.

WARNING

Rectifier/charger start-up is automatic when normal AC input circuit breaker Q1
is closed. DC voltage is present in the DC bus.

4.1

Start-up of a Module

Rectifier/charger start-up is automatic when the normal AC input circuit breaker Q1 is closed. The green
"rectifier/charger" light 1 on the control panel goes on. Close battery circuit breaker QF1.

Figure 4-1: Control Panel and Circuit Breaker Diagram.

4.1.1

Start-up of an Inverter

When the rectifier/charger is on, press the "inverter ON" button 7 on the control panel. The green "inverter" light
4 flashes.

4.1.2

Emergency Power Off (EPO)

The UPS emergency shutdown function is generally wired to a "mushroom-head" type emergency-off pushbutton.
In case of its use, the pushbutton contact has to reset.

IMPORTANT

After EPO/REPO, unit has to be reset by opening M2 feed (switch Q4S). Open
switch Q5N also, and then follow the procedure of single UPS for single unit or
parallel UPS for parallel units to start-up the system.

1

2

VA

W.Hz

fault

18

17

8

7

6

4

3

5

2

1

22

21

19

20

16

9

10

11

12

13

15

14

15

maintenance bypass:
Q3BP

inverter (B):
DC to AC
power

isolation:
Q4S

isolation and
protection:

Q5N

rectifier/
charger (A):
AC to DC
power

QF1: isolation
and protection

normal
AC
input

battery (D):
backup power

static bypass (C):

bypass
AC
input

Q1

isolation
and
protection

(1)

(2)

harmonic
fliter

*FUSE

*FUSE

Operation

4 — 1

86-133060-00 A00

Advertising