MGE UPS Systems GALAXY PW 225KVA User Manual

Page 70

Advertising
background image

The battery capacity is the value measured by the UPS microprocessor. It is expressed in Ampere-hours. This
value changes over time depending on the parameters of the battery itself and its environment. This measurement
is used to check that the battery is capable of supplying the rated power in the event of a mains outage.

The backup time is the value calculated by the UPS microprocessor on the basis of measurements carried out on
the battery. It is expressed in minutes. The calculation uses the percent load and the battery charge status at the
time of the measurement.

The load level is the ratio between the power supplied by the UPS to the load at the time of the measurement and
the rated output of the UPS. It is expressed as a percentage.

OUTPUT LOAD LEVEL(%)

T=30 days

▼ last read: 05/09/1997

63

|

0

|

0

|

0

|

0

52

|

0

|

0

|

0

|

0

63

|

0

|

0

|

0

|

0

63

|

0

|

0

|

0

|

0

0

|

0

|

0

|

0

|

0

0

|

0

|

0

|

0

|

0

BACKUP (min)

T=30 days

▼ last read: 05/09/1997

120

|

0

|

0

|

0

|

0

115

|

0

|

0

|

0

|

0

110

|

0

|

0

|

0

|

0

105

|

0

|

0

|

0

|

0

0

|

0

|

0

|

0

|

0

0

|

0

|

0

|

0

|

0

BATTERY CAPACITY (Ah)

T=30 days

▼ last read: 05/09/1997

97

|

0

|

0

|

0

|

0

96

|

0

|

0

|

0

|

0

95

|

0

|

0

|

0

|

0

94

|

0

|

0

|

0

|

0

0

|

0

|

0

|

0

|

0

0

|

0

|

0

|

0

|

0

Galaxy PWUPS 100 to 225kVA

Operation

4 — 22

86-133060-00 A00

Advertising