3 dc power voltage checks – SATO CL 408e User Manual

Page 77

Advertising
background image

Page 4-3

Section 4. Electric Checks and Adjustments

SATO CL408e/CL412e Service Manual

PN 9001078
Rev. B

4.3 DC Power Voltage Checks

To check voltage levels, first check the fuses (Section 6.3) and replace if necessary. Then

remove the LH cover, (Section 4.2) and perform the following steps.

Addtional equipment required:

TP Test Module

Digital Multimeter

STEP

PROCEDURE

Refer to illustrations on pages 4-3 through 4-5.

1.Attach the connector from the TP Test Module to the test port on

the main PCB. Note correct positioning of connector. Nibs on the

connector are placed down in the receptacle on the PCB in the

forward position.

2.Attach the ground probe of the multimeter to the TP Test Module

Gnd pin.

3.Attach the positive probe of the multimeter to the +SIG pin on

the TP Test Module terminal.

4.Turn printer on and rotate the dial to a dial POS on the TP Test

Module.  Record the values from the Multimeter LCD.

5.Confirm voltages are correct.

If not, then replace power supply.

Refer to Section 6.4.

6.After performing tests, replace the LH cover to the printer.

MAIN PCB

VR1 OFS

INTERFACE

BOARD

POWER SUPPLY

VR4 GAP

VR5 IM

CN13

TEST POINT
CONNECTOR

VR2 DEM

VR3 CE

Advertising
This manual is related to the following products: