Once a parallel pump operation cycle has been activated and the time for

Stop parallel opera-

tion has elapsed, system deviations greater than 5 °C cause the controller to suspend parallel
operation for 10 minutes and to apply priority operation.

Function

WE

Configuration

Parallel pump operation

OFF
10 min

FB9 = ON, PU
Stop parallel operation / 2 to 10 min

Note!
In system Anl 9, the control valve of the underfloor heating circuit is always closed with the
function block setting FB9 = OFF. With the setting FB9 = ON, select “PU“ to ensure it remains in
control operation even the parallel operation has been interrupted due to system deviations.

6.9

Priority circuit

(Anl 4, 5, 6, 7, 8 and 11)

In many district heating systems with primary DHW heating, the allotted amount of water is only
intended to supply the heating system. As a result, the capacity required for DHW heating
needs to be taken from the heating system when great heating loads occur; and this, until DHW
heating has been concluded.
Nevertheless, heating operation is not simply to be interrupted. Only the amount of energy re-
quired for DHW heating is to be deducted. This can be achieved by using the priority functions
Reverse control

and Set-back operation.

6.9.1 Reverse control

The capacity demand of the heating circuit is reduced when there is a system deviation of more
than 5 °C in the DHW circuit. This is achieved by the three-step output of the DHW circuit work-
ing in the opposite direction compared to the heating circuit control valve.
The amount of time in which the priority for the DHW circuit is given is set in the

Priority in case

of deviation parameter.

Function

WE

Configuration

Priority for
DHW circuit

OFF
10 min

FB8 = ON, select “In“
Priority in case of deviation / 2 to 10 min

6.9.2 Set-back operation

The heating circuit is set back to reduced operation for 20 minutes when a system deviation of
more than 5 °C arises in the DHW circuit. Its capacity demand is reduced by the value in

EB 5476 EN

55

Functions of the DHW circuit