Lucent Technologies Uninterruptible Power Systems 3000 VA User Manual

Page 53

Advertising
background image

UPS Operation 4

Lucent Technologies Model 3000 UPS Operator's Manual (167Ć405Ć119 Issue 3)

43

Use the following procedure to reinstall the UPS and transfer the critical load from

Maintenance Bypass (AC Line operation) to the UPS:

1 Reconnect the battery modules to the battery connector on the UPS rear

panel.

2 Turn the circuit breaker on all battery modules to the ON (

|

) position.

3 Plug the YĆcord of the Bypass Module into the power connectors on the

UPS as shown in Figure 18.

NOTE

Steps 4 through 7 are for changing the output voltage. The output voltage is

factoryĆconfigured for 230V. If you do not need to change the UPS output voltage, skip

to Step 8. Use the following table to select the correct output voltage according to your

Bypass Module.

Bypass Module

Model Number

UPS Voltage Selection*

60ĆHz BDM 208: 120/208

208

60ĆHz BDM 208: 120/240

208

60ĆHz BDM 208: 120

208

60ĆHz BDM 240: 120/240

Set to 220V for 110/220V BDM output

Set to 230V for 115/230V BDM output

Set to 240V for 120/240V BDM output

60ĆHz BDM 240: 120

Set to 220V for 110V BDM output

Set to 230V for 115V BDM output

Set to 240V for 120V BDM output

50ĆHz BIM 208 (Model 2500 only)

208

50ĆHz BIM 220

220

50ĆHz BIM 230

230

50ĆHz BIM 240

240

*The UPS output voltage should be set according to local mains voltage.

4 Press the Output

Off button untilthe alarm beeps.

All indicators flash simultaneously.

i