Building Regulations and the Benchmark
Commissioning Checklist

Building Regulations (England & Wales) require notification of

the installation of a heating appliance to the relevant Local

Authority Building Control Department. From 1 April 2005 this

can be achieved via a Competent Persons Self Certification

Scheme as an option to notifying the Local Authority directly.

Similar arrangements will follow for Scotland and will apply in

Northern Ireland from 1 January 2006.

The Health & Safety Executive operates the ‘Gas Safe Register’,

a self-certification scheme for gas heating appliances.

These arrangements represent a change from the situation

whereby compliance with Building Regulations was accepted as

being demonstrated by completion of the Benchmark Logbook

(which was then left on site with the customer).

With the introduction of Self Certification Schemes, the

Benchmark Logbook is being withdrawn. However, a similar

document in the form of a commissioning checklist and service

interval record is incorporated at the back of these instructions.

Potterton is a member of the Benchmark initiative and fully

supports the aims of the programme. Its aim is to improve the

standards of installation and commissioning of central heating

systems in the UK and to encourage the regular servicing of all

central heating systems to ensure safety and efficiency.

Building Regulations require that installations should comply

with manufacturer's instructions. It is therefore important that

the commissioning checklist is completed by the installer. The

relevant section of Building Regulations only relates to

dwellings. Therefore the checklist only applies if the appliance is

being installed in a dwelling or some related structure.

The flowchart opposite gives guidance for installers on the

process necessary to ensure compliance with Building

Regulations.

Legislation

4

1.0

Introduction

6

2.0

General Layout

7

3.0

Appliance Operation

8

4.0

Technical Data

9

5.0

Dimensions and Fixings

10

6.0

System Details

11

7.0

Site Requirements

14

8.0

Flue Options

18

9.0

Plume Displacement

23

10.0

Installation

27

11.0

Commissioning the Boiler

32

12.0

Completion

34

13.0

Servicing the Boiler

35

14.0

Changing Components

37

15.0

Illustrated Wiring Diagram

47

16.0

Fault Finding

48

17.0

Fault Indication Display

52

18.0

Short Parts List

53

Benchmark Checklist

54

Section

Page

Contents

© Baxi Heating UK Ltd 2009 All rights reserved. No part of this publication may
be reproduced or transmitted in any form or by any means, or stored in any
retrieval system of any nature (including in any database), in each case whether
electronic, mechanical, recording or otherwise, without the prior written
permission of the copyright owner, except for permitted fair dealing under
Copyrights, Designs and Patents Act 1988.

Applications for the copyright owner’s permission to reproduce or make other
use of any part of this publication should be made, giving details of the proposed
use, to the following address:

The Company Secretary, Baxi Heating UK Ltd, The Wyvern Business Park,
Stanier Way, Derby, DE21 6BF.

Full acknowledgement of author and source must be given.

WARNING: Any person who does any unauthorised act in relation to a
copyright work may be liable to criminal prosecution and civil claims for damages.

“Potterton” supports

0086

ISO 9001

FM 00866

Advertising