11.0

Commissioning the Boiler

33

© Baxi Heating UK Ltd 2009

OUT

MIN

Pressure Test Point
Sealing Screw

Gas Valve

Fig. 48

11.2

Checking the Burner Pressure

1. Turn on the gas and electrical supplies to the boiler

and ensure that all external controls are calling for

heat.

2. Set the temperature controls to maximum and the

selector switch to the Off position (Fig. 51).

3. Slacken the pressure test point sealing screw on the

gas valve and connect a pressure gauge (Fig. 48).

4. Undo the screws securing the inner door panel. Lift

the panel slightly to disengage it from the studs on top

of the case.

5. Turn the selector switch fully anticlockwise against

the spring pressure to the reset position and hold for

2 seconds to reset the boiler (Fig. 51).

6. Turn the selector switch to the Cental Heating and

Domestic Hot Water position ( ). The power On

neon ( ) will illuminate (Fig. 51).

7. Turn a hot water tap on to give a flow rate of at

least 10l/min.

8. The pressure should be :-

NG

10.2mbar

Propane

21.8mbar

If not, check that the gas supply pressure is correct
(Natural Gas 20mbar, and Propane 37mbar).

9. The pressure can be adjusted if required.

10. To check and set minimum pressure first remove

one of the modulator wires.

Adjusting the Pressure (Fig 49)

11. Remove the plastic protection cap from the

pressure adjustment nuts on the valve.

12. The smaller nut (5mm) adjusts minimum pressure

and the larger nut (8mm) maximum pressure.

13. Using a suitable spanner adjust the relevant nut

until the correct pressure is achieved.

14. Once the pressure has been set turn the boiler off

and disconnect the pressure gauge.

15. Tighten the pressure test screw and refit the

modulator to the valve. Reassemble in reverse order.

Fig. 49

Plastic
Protection
Cap

Modulator
Wire

Maximum Rate
Adjustment Nut

Minimum Rate
Adjustment Nut

NOTE: Gas Valve Electrical
Plug/Igniter not shown for clarity.

Fig. 51

Pressure Gauge

bar

0

1

2

3

4

Fig. 50

Selector Switch

Central Heating

Temperature Control

Hot Water

Temperature Control

Reset

Burner On

Flame Failure

Power On

bar

0

1

2

3

4

Power On

Neon

Advertising