0 commissioning the boiler – Baxi Potterton Condensing Combination Boiler Performa 24 Eco HE User Manual

Page 32

Advertising
background image

11.0

Commissioning the Boiler

32

© Baxi Heating UK Ltd 2009

11.1

Commissioning the Boiler

1. Reference should be made to BS 5449 Section 5
when commissioning the boiler.

2. At the time of commissioning complete all relevant
sections of the Benchmark Commissioning Checklist at
the rear of this publication.

3. Open the mains water supply to the boiler.

4. Open all hot water taps to purge the DHW system.

5. Ensure that the filling loop is connected and open,
then open the heating flow and return valves on the
boiler.

6. Open the screw on the automatic air vent
(Fig. 45).

7. The system must be flushed in accordance with BS
7593 (see Section 6.2) and the flushing agent
manufacturers instructions.

8. Pressurise the system to 1.0 bar then close and
disconnect the filling loop.

9. Turn the gas supply on and purge according to in GB
BS 6891 and in IE I.S. 813 “Domestic Gas Installations”.

10. Test for gas soundness.

11. If at any time during commissioning it is required to
terminate a particular cycle, e.g. the pump overrun
period, turn the selector to the OFF position and then
back to either ( ) or ( ) (Fig. 47).

Automatic Air

Vent

Screw

Fig. 45

Fig. 46

Pump

Fig. 47

Pressure Gauge

bar

0

1

2

3

4

Selector Switch

Central Heating

Temperature Control

Hot Water

Temperature Control

Reset

Burner On

Flame Failure

Power On

bar

0

1

2

3

4

Power On

Neon

Advertising