0 installation – Baxi Potterton Condensing Combination Boiler Performa 24 Eco HE User Manual

Page 30

Advertising
background image

10.0 Installation

30

© Baxi Heating UK Ltd 2009

10.7

Fitting the Flue (Cont)

5. Mark dimension ‘Y’ on the flue as shown (Fig. 37).

Carefully cut the waste material from the flue, ensuring

that the ducts are square and free from burrs.

6. The inner flue duct support bracket may be in the

waste portion of the flue. In this case retrieve the

bracket before discarding the waste.

7. Take the inner flue support bracket (if not already

fitted) and engage it over the flue duct. This will

centralise the flue and air ducts, and ease assembly

(Fig. 38).

8. Insert the flue through the hole in the wall. Fit the

elbow to the boiler adaptor, ensuring that it is pushed

fully in.

9. Draw the flue back through the wall and engage it in

the elbow. It may be necessary to use soap solution or

similar to ease assembly of the elbow adaptor and flue

(Fig. 39).

10. Make good between the wall and air duct outside

the building.

11. Fit the flue trim if required, and if necessary fit a

terminal guard (see Section 8.8 & 8.9).

VERTICAL FLUE

1. Only a flue approved with the Potterton Performa 24

Eco HE can be used.

Flue Elbow

Fig. 39

Inner Flue Support Bracket

Fig. 38

Y

Flue

Waste

Fig. 37