NEC EXPRESS 320Lb-R User Manual

Page 200

Advertising
background image

6-12 Maintenance

8.

Carry the backplane, rails and modules separately.

IMPORTANT:

If the server is a tower model, do not hold the front bezel to lift it. The

front bezel may get detached and fall off from the server, causing damage to the server.

9.

Protect the server with the shock-absorbing materials, and pack it securely.

IMPORTANT:

Check and adjust the system clock before operating the server again after relocating or
storing it.
If the server and the built-in optional devices are moved from a cold place to a warm place in
a short time, condensation will occur and cause malfunctions and breakdown when these are
used in such state.

When you start operating these equipments again after the transportation

or the storage,

make sure to wait for a sufficient period of time to use them in the operating

environment.
If the system clock goes out of alignment remarkably as time goes by, though the system
clock adjustment is performed, contact your sales agent.

Advertising