Rack-mounted installation, Power on – TRENDnet TEG-S3000I User Manual

Page 15

Advertising
background image

13

Attaching Rubber Feet

A. Make sure mounting surface on the bottom of the Switch is grease and dust free.

B. Remove adhesive backing from your Rubber Feet.

C. Apply the Rubber Feet to each corner on the bottom of the Switch. These footpads

help prevent the Switch from shock/vibration.


Rack-mounted Installation

The TEG-S3000i chassis switch comes with a rack-mounted kit that can be mounted in

an EIA standard size, 19-inch Rack. The Switch can be placed in a wiring closet with

other equipment.

Perform the following steps to rack mount the switch:

A. Position one bracket to align with the holes on one side of the switch and secure it

with the smaller bracket screws. Then attach the remaining bracket to the other

side of the Switch.

B. After attached both mounting brackets, position the switch in the rack by lining up

the holes in the brackets with the appropriate holes on the rack. Secure the Switch

to the rack with a screwdriver and rack-mounting screws.

Note: For proper ventilation, allow at least 4 inches (10 cm) of clearance on the

front and 3.4 inches (8 cm) on the back of the Switch. This is especially important

for enclosed rack installation.


Power On

Connect the power cord to the power socket on the rear panel of the Switch. The other

side of power cord connects to the power outlet. The internal power supply of the Switch

works with voltage range of AC in the 100-240VAC, frequency 50~60Hz. Check the

Advertising