Front – GE Industrial Solutions LP33 Series 80 & 100 Installation Guide User Manual

Page 17

Advertising
background image

Modifications reserved

Page 17/47

OPM_LPS_3UI_80K_M10_1US_V010.doc

Installation Guide LP33 Series 80 & 100 UL S1

Opening for input and output cable connections LP33 Series 80 & 100

Front

230mm

9.0

6"

18

2mm

7.17

"

900mm

50mm

50mm

35.44"

1.97"

1.97"

LP

S33U

_080

-100

_UPS

v

ie

w

bo

tt

om

_0

1

Fig. 3.4-2 Opening on the bottom of the cabinet for input and output cables

LP33 Series 80 & 100 opening is
provided on the bottom of the UPS
for the connection of input and
output cables.


Pay attention to the position of this
opening, when choosing the
placement of the UPS.

Fixing of the UPS cabinet LP33 Series 80 & 100 on the floor

Ø 12mm

Ø 0.47"

LPS33U_080-100_UPS fixing_01

Front

830m

m

32.

68"

46mm

1.

78"

940mm

31.5mm

31.5mm

37.00"

1.24"

1.24"

Ø 12mm

Ø 0.47"

Fig. 3.4-3 UPS cabinet floor fixing points

The UPS cabinet is free standing and
normally does not require to be
bolted to the floor.


The UPS cabinet can be fixed
however to the floor by bolting it
with the supporting blocks to the
floor.

Positioning of the LP33 Series 80 & 100 Parallel System

LPS33U_0

80-100_R

PA disposi

tion_GE_0

1

1

4

3

2

Fig. 3.4-4 RPA system disposition


The UPS cabinet is free standing
and normally does not require
to be bolted to the floor.


The UPS cabinet can be fixed
however to the floor by bolting
it with the supporting blocks to
the floor.