3 epo (emergency power off) – GE Industrial Solutions LP33 Series 80 & 100 Installation Guide User Manual

Page 41

Advertising
background image

Modifications reserved

Page 41/47

OPM_LPS_3UI_80K_M10_1US_V010.doc

Installation Guide LP33 Series 80 & 100 UL S1

4.3 EPO (EMERGENCY POWER OFF)

WARNING !

Connections described in this chapter shall be done only by a GE SERVICE ENGINEER.



An external Emergency switch (NC -
Normally Closed voltage-free contact)

can be connected on terminals X7 / 1, 2
of the P1 – Control board.


NOTE !

Check that the Jumper JP5
is not installed on the P1 –
Control board.


LPS33U_0

80-100_UP

S+X7_01

Q2

I ON

0 OF

F

I ON

0 OF

F

F11-12-13

1

2

JP5

X7

P1 - Control board

Fig. 4.3-1 Terminals X7 - EPO

In a parallel system a
separate NC
(Normally
Closed) contact must be
connected individually to

each unit.



When activated, this switch causes the immediate shutdown of booster, battery-charger, inverter; and
the contactors K4, K6 and K7.

NOTE !

This procedure could imply a Load shutdown.



When the EPO has been activated, the system must be restored as follows:

Press the push-button EPO (contact on X7 / 1, 2 is closed again).

Press the key O (Inverter OFF – see Section 6.2 of Operating Manual) on the control panel.

Press the key I (Inverter ON – see Section 6.2 Operating Manual) on the control panel.


In case of a Parallel System press the key “O” (Inverter OFF) on the control panel of
each unit connected on the parallel bus and having its output switch Q1 closed.

Advertising