2 internal battery breaker, Access to the terminals for the cable connections – GE Industrial Solutions LP33 Series 80 & 100 Installation Guide User Manual

Page 28

Advertising
background image

Modifications reserved

Page 28/47

OPM_LPS_3UI_80K_M10_1US_V010.doc

Installation Guide LP33 Series 80 & 100 UL S1

Access to the terminals for the cable connections

LPS33U_0

80-100_Co

nnection_

01US

A

Bottom

entry cables

Q2

Q1

F11

F12

F13

B

C

D

Fig. 3.8.1-1 Access to the input / output connections

To access input, output and battery
connections proceed as follows:

• Open the front door “A” of the cabinet.

• Remove the protection panel “B”.

• Remove the plate “C” for bottom cable

entry.

NOTE !

Drill in the plate “C” appropriate holes for cable conduits (max. 4 x 2 1/2”).
Please remove the plate “C” before drilling any holes.
See Fig 3.8.1-1
- details “C & D”.



3.8.2 Internal Battery Breaker

The option Battery cabinet is

equipped with Breaker FTM3.

In case of replacement the same
type and the same rating must be
used.

WARNING !

Wrong polarity
connection can cause
hazard to UPS and
personal.
The replacement of
Battery Breaker FTM3

must be performed by
QUALIFIED SERVICE
PERSONAL only.

LPS33U_080-100_UPS+Battery cabinet 0650_02

Q2

I ON

0 O

FF

F11-12-13

Q1

I ON

0 O

FF

SNMP
CI

RS232
RC

Q2

Q1

FTM3

Fig. 3.8.2-1 Battery Breaker

Advertising