3.6 UNPACKING


Move the equipment in it’s original packing, carton box or wooden case, until the place of installation
and remove the packing and the transport sockets only just before installing the UPS.


Procedure for the unpacking of the
UPS:

1

A

LPS33U_0

80-100_Un

packing_0

1

CENTER

OF

GRAVITY

UL

g

imaginatio

n at work

• Make sure to have sufficient

space around the UPS before
you start unpacking.

• Cut the straps A fixing the

carton box.

2

B

LPS33U_0

80-100_Un

packing_0

2

g

imaginatio

n at work

CENTER

OF

GRAVITY

UL

C

• Remove packageB.
• Remove the protection Cand

the accessories bag.

• Remove the screws “D” on the

four small bracket.

• Use a forklift to raise the UPS

from the floor.

• Remove the two wooden plates

E.

3

B

LPS33U_0

80-100_Un

packing_0

3

g

imaginatio

n at work

CENTER

OF

GRAVITY

UL

C

E

D

Fig. 3.6-1 LP33 Series 80 & 100 unpacking sequence

NOTE !

Be aware of the
heavy weight of the
UPS, in particular if
already equipped
with Batteries.

Included in the delivery you can find the following parts:

Control Bus cables (only for RPA parallel system)

CD-ROM connectivity

An accessories bag