3.9.3 Battery connection

Before proceeding to a battery connection, follow the Safety Rules concerning the battery.
Make sure that the UPS is not powered and remove the external battery protections.



NOTE IN CASE OF EXTERNAL BATTERY !

To meet standards concerning electromagnetic compliance, the connection
between the UPS and external Battery
must be done by using a shielded cable or
suitable shielded (metal) conduit!





Standard battery type for LP33 Series 80 & 100

Battery type

Technical Data

Manufacturer

UPS12-540MR HIGH RATE MAX

12Vdc 147Ah 100lbs/45kg

C & D Technologies, Inc.





List of possible battery configurations on LP33 Series 80 & 100

Autonomy (min.)

Battery cabinet / Width

Battery

type

Block

number 80kVA 100kVA

Note

One battery cabinet 26” / 650mm

147Ah

24

15

9

See Fig.

3.9.3-1 & 3

One battery cabinet 48” / 1215mm

294Ah

(2 x 147Ah)

48 41 30

See Fig.

3.9.3-2 & 4

One battery cabinet 26” / 650mm
One battery cabinet 48” / 1215mm

441Ah

(3 x 147Ah)

72 65 52

See Fig.

3.9.3-1 & 2 & 5

Two battery cabinet 48” / 1215mm

588Ah

(4 x 147Ah)

96 92 70

See Fig.

3.9.3-2 & 4 & 5

One battery cabinet 26” / 650mm
Two battery cabinet 48” / 1215mm

735Ah

(5 x 147Ah)

120 113 92

See Fig.

3.9.3-1 & 2 & 5

Three battery cabinet 48” / 1215mm

882Ah

(6 x 147Ah)

144 132 108