Wiring connection

LP

S33U_

080-

100_

UP

S+

EP

O X

A_03

XA

FTM3

UPS cabinet

Battery cabinet

26"/650mm

FTM3

Battery cabinet

48"/1215mm

1 2 3 4 5 6

1 2 3 4 5 6

Customer EPO connection

UPS internal

connection

Max. rating XA:
2.5mm² / AWG 12

1 2 3 4 5

3

4

XB

XB

1 2 3 4 5

XB -

Female

Max. rating XB:
2.5mm² / AWG 12

Cable 4x

Cable 4x

XB - Female

XB - Male

XB - Female

XB - Male

XB -

Female

Max. rating XB:
2.5mm² / AWG 12

XA

(before to connect
remove the bridge XA - 3/4)

Eventually next
battery cabinet

b

c

d

a

b

c

d

a

Fig. 5-1 Terminals XA and connector XB female – Wiring connection

NOTE !

To enable this function, remove Jumper JP5 on the P1 – Control board and
check the cable connection on the terminal X7 / 1, 2
(see Fig. 4.3-1 / Chapter 4.3).
In case of the Customer Interface, remove the Jumper JP3 and the cable on the
terminal X2 / 1, 2
(see Fig. 4.4-2 / Chapter 4.4).

In a parallel system a separate NC (Normally Closed) contact must be connected
individually to each unit.

NOTE !

This procedure could imply a Load shutdown.

When the EPO has been activated, the system must be restored as follows:

Press the push-button EPO (contact on XA / 3, 4 is closed again).

Press the key O (Inverter OFF – see Section 6.2 of Operating Manual) on the control panel.

Press the key I (Inverter ON – see Section 6.2 Operating Manual) on the control panel.

In case of a Parallel System press the key “O” (Inverter OFF) on the control panel of
each unit connected on the parallel bus and having its output switch Q1 closed.