4 rpa system - control bus connection, 2 - remove the front panel “ b – GE Industrial Solutions LP33 Series 80 & 100 Installation Guide User Manual

Page 35

Advertising
background image

Modifications reserved

Page 35/47

OPM_LPS_3UI_80K_M10_1US_V010.doc

Installation Guide LP33 Series 80 & 100 UL S1

3.9.4 RPA system - Control bus connection

WARNING !

This operation must be performed by TRAINED PERSONNEL ONLY before the initial
start-up (ensure that the UPS installation is completely powered down).

Access to the RPA board

1 - Open the front door A of the UPS

cabinet.

2 - Remove the front panelB.

3 - Remove with appropriate tool the

metallic window C from the metal
screenD.

LPS33U_0

80-100_RP

A connect

ion_01

Q2

I ON

0 O

FF

I ON

0 O

FF

F11-12-13

C

P13

B

A

D

Fig. 3.9.4-1 Access to the RPA board

NOTE !

Put in place the front
screen “A”
paying
attention to not
damaging the control
bus cables.

LP

S

33U

_030-040_R

P

A

connec

tion_G

E

_02

J4
J3

LP 33 Series

1

P1

P13

P34

P1

J3

P13

J4

P34

LP 33 Series

2

J3

P1

P13

J4

P34

LP 33 Series

3

P34

J4
J3

P1

P13

LP 33 Series

4

Fig. 3.9.4-2 Bus connection RPA parallel system

Bus connection RPA parallel system
Connect the control bus cable between the parallel units as indicated in the diagram Fig. 3.9.4-2.

Provide that the connectors J3 and J4 are properly fixed with the included screws.

NOTE !

The jumper JP1 - JP2 - JP3 must be
removed only on the intermediate units,
where the connectors J3
and J4 are both
inserted.
Do not insert or remove J3
and J4 from the
board “P16 - Connector adapter RPA”

when the parallel system is operating.

P1

J3

P13

J4

P34

LP

S

33

U

_0

30

-0

40

_R

P

A

c

on

ne

ct

ion

_0

3

JP1

JP2

JP3

Fig. 3.9.4-3 Connection to Board P16

Advertising