1opening for top cable entry (*), 2opening for bottom cable entry (*), 3bus bars for utility input and load output – GE Industrial Solutions SG Series 750 T12 UL S2 Installation Guide User Manual

Page 10: 4bus bars for external battery connection, Cr1 connectivity rack with a customer interface, Ss service socket 120vac / 6a, Xb terminals for epo connection

Advertising
background image

Modifications reserved

Page 10/49

OPM_SGS_ISG_M75_M75_2US_V010.doc

Installation Guide SG Series 750 UL S2 & SG Series 750 T12 UL S2

2.3

RECTIFIER CABINET LAYOUT SG Series 750 & SG Series 750 T12

SGS_750_UPS_

Rectifier cabinet_

GE_01

Fig. 2.3-1 Rectifier cabinet general view

SGS_750_S2_

UPS_Rectifier c

abinet_GE_02

Q1

2

14
15

34

16
17

56

19
20

89

18

7

22

11

1

21

10

12

12

13

4

1

3

2

4

1

3

2

Fig. 2.3-2 Rectifier cabinet general view with open doors


SGS_750_UPS

_Rectifier cabin

et_GE_03b

Q1

4

1

3

XB

XA

SS

CR1

CR2

2

14
15

34

16
17

56

19
20

89

18

7

22

11

1

21

10

12

12

13

3
4

2

1

2

3

1

4

2

Fig. 2.3-3 General rectifier cabinet view without protection panels

1

Opening for top cable
entry (*)

2

Opening for bottom
cable entry (*)

3

Bus bars for Utility
input and Load output

4

Bus bars for external
Battery connection

CR1 Connectivity Rack with

a Customer Interface

CR2 Connectivity Rack for

additional Customer
Interface

SS

Service socket 120Vac
/ 6A

XA Terminals for 24Vdc

Auxiliary Power Supply
connection and Battery
Breaker Release

XB Terminals for EPO

connection

*) Remove this panel or
provide means to capture
metal filings from cutting
conduit entry holes.

Advertising