Installation Guide SG Series 750 UL S2 & SG Series 750 T12 UL S2

3.10.3 Control bus cable location

WARNING !

This operation must be performed by QUALIFIED SERVICE PERSONNEL ONLY before
the initial start-up.
ENSURE THAT THE UPS INSTALLATION IS COMPLETELY POWERED DOWN.


SGS_750_RPA

control bus cab

le_GE_01a_US

Q1

Next parallel unit

Rectifier cabinet

18

2

19
20

89

7

22

11

1

21

10

2

1

2

3

4

3

4

14
15

34

16
17

56

12

12

13

1

Fig. 3.10.3-1 View electronic module on intermediate unit

Access to the control bus
connection.

The control bus connection
between parallel units must be

made on the electronic module
P34 – Bus Interface (IM0048)
situated at the inside of the UPS
door.


S

G

S

_750_R

P

A

control bus cable_02U

S

Next parallel unit

A

B

JA

JA2

JB2

JB1

JA1

JB

Fig. 3.10.3-2 Front view electronic module on intermediate unit

Control bus cables connection.

• Plug the cables JA (1/2/3/4/5)

and JB (1/2/3/4/5) onto the RJ
connectors JA and JB located
on parallel bus PCB P34 – Bus
Interface (IM0048)
(going to
“P13 – RPA Board” J52(A) and
J62(B)).

Fix both cables JA (1/2/3/4/5)

and JB (1/2/3/4/5) to parallel
bus socket connecting the
cable shield to ground by

means the cable clamps “A“.