Installation Guide SG Series 750 UL S2 & SG Series 750 T12 UL S2

4.1.6 EPO (Emergency Power Off) Input contact

BE AWARE !

The reliability of the system depends on this contact NC (Normally Closed)!

An external Emergency switch (Normally Closed voltage-free contact)

can be connected on terminals XB / 1 - 4 or connector J2 / 12 - 25 of the
P4 - Interface Customer.

NOTE !

To enable this function,
remove cable short-
circuiting XB / 2 -
3 on the
Terminal XB
and the
Jumper JP3 on P4 –
Customer Interface
, when
the cables have been
already connected on XB
or J2
.

SGS_750_S2_

UPS_XA-XB_01

Q1

XB

XA

1

2
3
4

4

3

2

1

2
3

1

4

2

3

1

4

2

1415

34

16
1

7

56

19
20

89

18

7

22

11

1

21

10

12

12

13

Terminals XB

SG

S

_75

0_

T

e

rm

in

al

s XA

_0

1

2

4

3

1

Fig. 4.1.6-1 Terminals XB for connection EPO

When opened, this contact causes the
immediate opening of the Bypass

Contactors K6 and K7, Rectifier input
contactor K4
, External Battery Breaker (if
present) as well as the shutdown of the
Rectifier and the Inverter and the Static-
Switch
.

1

12
13

2

14

3

15

4

16

5

17

6

18

7

19

8

20

9

21

10

22

11

1

14

9

1

J2

S

G

S

_750_Cus

to

mer

in

te

rf

ace_J2

-JP

3_01

2

1

JP3

1

1

2

2

3

3

4

4

XB

41

32

41

32

3

2

1

3

2

1

2

11

2

Fig. 4.1.6-2 Customer interface

NOTE !

This procedure could imply a Load shutdown.

NOTE !

In case of parallel Customer Interface the EPO contact must be connected to one
Customer Interface
only, but the bridge on X2 and Jumper JP3 on the P4 –
Customer Interface
must be removed on all other boards.

In a parallel system a separate NC (Normally Closed) contact must be connected
individually to each unit.


When the EPO has been activated, the system must be restored as follows:

Realize the push-button EPO (contact on XB / 1, 4 is closed again).

Press the key O (Inverter Off – see Section 5.2 – Operating Manual) on the control panel.