5 ventilation and cooling, Ventilation and cooling – GE Industrial Solutions SG Series 750 T12 UL S2 Installation Guide User Manual

Page 18

Advertising
background image

Modifications reserved

Page 18/49

OPM_SGS_ISG_M75_M75_2US_V010.doc

Installation Guide SG Series 750 UL S2 & SG Series 750 T12 UL S2

3.5

VENTILATION AND COOLING

Fig. 3.5-1 Installation on solid floor

The heat produced by the UPS is transferred
to the environment by its ventilation.

Air inlets for UPS ventilation are located on the
front and bottom of the UPS, while air outlets
are on top of the cabinet.

A suitable ventilation or cooling system must
be installed to extract the heat from the UPS
room.



NOTE !

Do not put anything on the top of the cabinet.




Air filtration systems could be required when the UPS operates in a dirty environment.

Contact your Dealer or the nearest Service Center for appropriate solutions.

In order to prevent overheating of the UPS, the available air intake flow rate must exceed the total air
exhaust flow rate requirement of the UPS system.


The below tables indicate the heat dissipation at full Load at PF = 0.9 lag. and charged Battery, up to
3,280 ft (1,000 m) altitude, for cooling air 77°F (25°C) to 86°F (30°C).

Losses

Cooling air flow

UPS rating with options

BTU / hr

kW

CFM

m

3

/ h

SG Series 750 (6 pulse) with 5

th

filter

152,219 44.6 7,657 13,009

SG Series 750 (6 pulse) with 5

th

& 11

th

filter

154,949 45.4 7,794 13,242

SG Series 750 T12 (12 pulse) without filter

178,840 52.4 8,996 15,284

SG Series 750 T12 (12 pulse) with 11

th

filter

181,570 53.2 9,157 15,517

SG Series 750 (6 pulse) in eBoost™ Operation Mode

30,376 8.9 1,528 2,596

SG Series 750 T12 UPS in eBoost™ Operation Mode

32,765 9.6 1,649 2,800

Advertising