Installation Guide SG Series 750 UL S2 & SG Series 750 T12 UL S2

3.9.3 Power connection dual input utility (option)

SGS

_

750_S2_U

P

S

c

onnec

tion s

epara

te_G

E_

01_U

S

PE Load

PE Input Utility

L1-1

1 - INPUT UTILITY RECTIFIER

L3-1

L2-1

+

common NEMA two hole lugs

Typical installation using

-

PE Load

PE Input Utility

L2

Neutral Utility (Bypass)

Neutral Load

L3

LOAD

L1

must be screwed onto the bus bars

wit 2 bolts M4x10

Typical installation using
common NEMA two hole lugs

PHASE BARRIER NOMEX SHEET

After cable connections to the

bus bars are done, the

In

ca

se

of

du

al

in

pu

t u

tilit

y

MUST BE

REM

O

V

ED

!

BR

1,

BR

2 a

nd

BR

3

L1-2

2 - INPUT UTILITY BYPASS

L2-2

L3-3

(option)

Fig. 3.9.3-1 SG Series 750 & SG Series 750 T12 power connections Dual Input Utility (option)


Use M12x35 bolts for the cable connections on INPUT / OUTPUT power wiring Bus Bars.
Cable terminations are to the Rectifier Input / Output Bus Bars as shown above.
Connect wire to the Bus Bars using appropriate tools and appropriate torque.
Torque specification for two hole lugs on Bus Bars: see Section 3.9.1.

Dual Input Configuration Rectifier / Bypass (option)

L1-1

Rectifier Phase A

L1-2

Bypass Phase A

L2-1

Rectifier Phase B

L2-2

Bypass Phase B

L3-1

Rectifier Phase C

L3-2

Bypass Phase C

PE Input Utility

Ground

N - Bypass

Bypass Neutral

For dual input configurations, a neutral conductor is required from the bypass source
only. The interconnection links BR1
, BR2 and BR3 MUST BE REMOVED (see Fig. 3.9.3-3).


Output Load

L1

Load Phase A

L2

Load Phase B

L3

Load Phase C

N

Load Neutral

PE Load

Load Ground