6 unpacking, Unpacking – GE Industrial Solutions SG Series 750 T12 UL S2 Installation Guide User Manual

Page 19

Advertising
background image

Modifications reserved

Page 19/49

OPM_SGS_ISG_M75_M75_2US_V010.doc

Installation Guide SG Series 750 UL S2 & SG Series 750 T12 UL S2

3.6

UNPACKING


The UPS and Battery Cabinets may be shipped packaged in wooden crates.
Move the cabinets as close as possible to the final location before removing from the pallet.
Remove the cabinet from the wooden crates with care, because of the heavy weight of the equipment.

White color

=

without any anomaly

Red color

=

anomaly evidence

Fig. 3.6-1 ShockWatch device

Fig. 3.6-2 TiltWatch device

The package of the SG Series 750 &
SG Series 750 T12 is equipped with
ShockWatch (indicator for shock),
and

TiltWatch (indicator for

overthrow) on the outside.

These devices indicate an eventual
shock or overthrow during transport.


Whenever these devices show a
possible anomaly, the UPS shall not
be commissioned before consulting
a “Service Center”
.

NOTE !

Take care not to damage the UPS when moving by forklift.
A damaged UPS must never be installed or connected to Utility
or Battery!
In case of any damage sustained during the transport, immediately inform the
shipping agent!
A detailed report of the damage is necessary for any indemnity claim.

For parallel systems, the delivery also includes the bus control cables for inter-
connecting the UPS modules.

Packing material recycling
GE
, in compliance with environment protection, use only environmentally friendly
material.
UPS packing materials must be recycled in compliance with all applicable
regulations.

Advertising