4 customer interface, Customer interface, 4customer interface – GE Industrial Solutions SG Series 750 T12 UL S2 Installation Guide User Manual

Page 44: Cr2 cr1, Service center

Advertising
background image

Modifications reserved

Page 44/49

OPM_SGS_ISG_M75_M75_2US_V010.doc

Installation Guide SG Series 750 UL S2 & SG Series 750 T12 UL S2

4

CUSTOMER INTERFACE





Connectivity Rack CR1 and CR2

SGS_750_UPS

_CR1-CR2_01

Q1

CR2

CR1

18

2

19
20

89

7

22

11

1

21

10

2

1

2

3

4

3
4

14
15

34

16
17

56

12

12

13

1

SG Series 750 & SG Series 750 T12 are
delivered with 2 Connectivity Rack (CR1
and CR2).

CR1 Connectivity Rack with a

Customer Interface (see Section
4.1)

CR2 Connectivity Rack for additional

Customer Interface (option)



WARNING !

The installation of the option “Additional Customer Interface” must be
performed by a SERVICE ENGINEER
from of your

Service Center

.

The operation must be performed with the UPS system COMPLETELY SHUTDOWN.

Advertising