Rectifier cabinet, Front side – GE Industrial Solutions SG Series 750 T12 UL S2 Installation Guide User Manual

Page 16

Advertising
background image

Modifications reserved

Page 16/49

OPM_SGS_ISG_M75_M75_2US_V010.doc

Installation Guide SG Series 750 UL S2 & SG Series 750 T12 UL S2

SG Series 750 & SG Series 750 T12 openings for input and output cable connections
SG Series 750 & SG Series 750 T12 openings are provided on the top and the bottom of the rectifier
cabinet for the connection of input and output cables.
Pay attention to the position of these openings, when choosing the placement of the UPS.
These openings are covered with a protective plate.

Utility input
Output Load
Battery

SGS_750_UPS v

iew top_01US

Rectifier cabinet

900

mm

35.

43"

145

mm

730

mm

28.

74"

2.09"

5.7

1"

349mm

13.74"

66.93"

1700mm

53mm

NOTE!
Remove this panel or provide
means to capture metal filings

from cutting conduit entry holes

Fig. 3.4.1-2 SG Series 750 & SG Series 750 T12 opening on top of the cabinet for input & output cables

Utility input
Output Load
Battery

SGS_750_UPS view

bottom_01US

28

.74

"

10

8m

m

4.2

5"

86

3m

m

33

.98

"

73

0m

m

1663mm

65.47"

349mm

13.74"

28mm

1.1"

Rectifier cabinet

NOTE!
Remove this panel or provide
means to capture metal filings

from cutting conduit entry holes

Fig. 3.4.1-3 SG Series 750 & SG Series 750 T12 opening on the bottom of the cabinet for input & output cables


SG Series 750 & SG Series 750 T12 fixing of the UPS cabinet on the floor
The UPS cabinet is free standing and normally does not require to be bolted to the floor.
The UPS cabinet can be fixed however to the floor by bolting it with the supporting blocks to the
floor. See Fig. 3.4.1-4.

Front side

SGS_750_UPS view bottom_02aUS

Fig. 3.4.1-4 SG Series 750 & SG Series 750 T12 fixing of the UPS cabinet on the floor

Advertising