3.8.3 Battery over current protection and wire sizing


Please read the safety precautions at the front of this guide carefully, and thoroughly review the Battery
manufacturers installation and maintenance manual before connecting the batteries to the UPS.

If the UPS system has been purchased with an accompanying Battery Cabinet, that cabinet should
have an integral Battery Circuit Breaker.

If the UPS has been purchased without a Battery Cabinet or remote rack mounted batteries are to be
used then DC over current protection must be provided by others.

Choose an appropriate DC fuse or circuit breaker using the current data in the chart below.

Minimum Battery Cable requirement is based on the current data below.

The AC values below are current ratings per phase.

These maximum and nominal ratings should be considered when choosing the appropriate AC over current

protection device.

NEC (National Electric Code) Section 210-20 a rules must be applied.

DC current rating is the nominal battery discharge current which the UPS allows.

(See Fig. 3.8.1-1 and 3.8.1.2)

AC Input

Rectifier (A)

AC Input

Bypass (A)

AC Input

(A)

DC Input

(A)*

F1

F3

F4

Nom. Max.

F2

Nom. Max. Nom.

Max.

SG Series 750 (6 pulse) with 5

th

filter

920 1103 902 902 1103

1512

1793

SG Series 750 (6 pulse) with 5

th

& 11

th

filter

900 1080 902 902 1080

1512

1793

SG Series 750 T12 (12 pulse) without filter

1082 1306 902 1082 1306 1512

1793

SG Series 750 T12 (12 pulse) with 11

th

filter

1032 1245 902 1032 1245 1512

1793

*)

DC over current sized to support maximum DC current.

Size of Branch Circuit Over current Protection - All Models: - "CAUTION - To reduce the risk of fire, only

connect UPS to a circuit provided with (See below) maximum amperes branch circuit over current protection

in accordance with the NEC (National Electric Code), NSI / NFPA 70

AC Input

Rectifier (A)**

AC Input

Bypass (A)**

AC Input

(A)**

DC Input

(A)

F1

F2

F3

F4

SG Series 750 (6 pulse) with 5

th

filter

1200 A

1000 A

1200 A

2000 A

SG Series 750 (6 pulse) with 5

th

& 11

th

filter

1200 A

1000 A

1200 A

2000 A

SG Series 750 T12 (12 pulse) without filter

1600 A

1000 A

1600 A

2000 A

SG Series 750 T12 (12 pulse) with 11

th

filter

1600 A

1000 A

1600 A

2000 A

**)

Assumes 100% rated Circuit Breakers. Verify size for application of 80% rated devices.

WIRING
Wire sizing according to
NEC Section 210-20 (a) Table 310-16
Use 75°C (167°F) copper wire

Wiring requirements:
AC INPUT RECTIFIER:

3-Phase, 3 wire plus Ground

AC INPUT BYPASS:

3-Phase, 4 wire plus Ground

AC OUTPUT:

3-Phase, 4 wire plus Ground

DC INPUT:

2 wire (positive and negative) plus Ground

Maximum recommended cable size

UPS rating

Rectifier Input

Bypass Input

DC Input

AC Output

GND

SG Series 750
SG Series 750 T12

5 x 500 MCM

4 x 500 MCM

6 x 600 MCM

4 x 500 MCM

4 x 500 MCM

Advertising