Installation Guide SG Series 750 UL S2 & SG Series 750 T12 UL S2
Crane
If the packed UPS cabinets have to
be lifted by crane, use suitable
carrying belts taking note of the
CENTER OF GRAVITY marked on the
package.
Take all necessary precautions to
avoid damage to the cabinet while
hoisting the UPS.
Crane
Fig. 3.1-3 Position of the carrying belts when moving
the unpacked rectifier cabinet and inverter cabinet
WARNING !
PLEASE DO NOT LIFT
UNPACKED UPS CABINETS
USING A CRANE.
WARNING !
When loading / unloading and when
moving the UPS, it is forbidden:
When loading / unloading and when
moving the UPS, pay attention to: