Bottom entry cables, Top entry cables, Rectifier cabinet – GE Industrial Solutions SG Series 750 T12 UL S2 Installation Guide User Manual

Page 29

Advertising
background image

Modifications reserved

Page 29/49

OPM_SGS_ISG_M75_M75_2US_V010.doc

Installation Guide SG Series 750 UL S2 & SG Series 750 T12 UL S2

CAUTION !

Panel “A and B” should never be removed or replaced with power applied to the UPS.
These panels are in close proximity to 480V live buss bars.
Always disconnect the rectifier, bypass, load and battery sources from the UPS
before removing or replacing these panels.
If not serious injury or death could occur!

How to access the input /output and DC bus bars for the cable connections.

SGS_750_S2_U

PS connection_G

E_01_US

B

A

Bottom entry cables

!

Top entry cables

!

Rectifier cabinet

NOTE!
Remove this panel or provide
means to capture metal filings

from cutting conduit entry holes

NOTE!
Remove this panel or provide
means to capture metal filin

from cutting conduit entry h

4

3

13

2

1

12

10

21

1

11

22

7

18

9

8

20

19

6

5

17

16

4

3

15

14

2

4

1

3

2

1

2

Fig. 3.9.1-1 SG Series 750 & SG Series 750 T12 access to the input / output connections

To access input, output and Battery Connections proceed as follows:
• Remove the protection panel “A.
• Remove the UPS side panel “B.

Advertising