Installation Guide SG Series 750 UL S2 & SG Series 750 T12 UL S2

3.10.2 Parallel control bus connection

In cases of parallel operation, the communication between the units takes place through the control
bus cables
.

Each parallel unit is equipped with an additional board “P13 RPA Board where the connectors J52 (A)
and J62 (B) are located.
A short control cable provided with a ferrite ring core links the parallel board “P13 – RPA Board with the
parallel bus socket on which must be connected the control bus cables JA and JB on PCB P34 – Bus
Interface
.
All the parallel units are connected to the same control bus.

This connection allows:

The microprocessors of each unit to communicate with each other.

The oscillators of each unit to be locked together.

The regulation loops to compare the output current of each unit in order to equally share the Load
current.


For increased reliability, this connection is made with redundant cables.
In this way, communication is maintained between units in case one of the control cables should fail or
be accidentally damaged or disconnected.

The standard length of the control bus cable between two parallel unit is 40 ft / 12 m.
Maximal overall length of bus connection, between the first and the last unit, should not be longer than

276 ft / 84 m.
Verify that control wiring is run in individual separate steel conduit.

NOTE !

Under no circumstance should the control bus cable connecting JA (1/2/3/4/5) and
JB (1/2/3/4/5)
be connected or disconnected after the system has been powered On.


JA3

JA2

JB3

JB2

JB

JA1

JA

JP2

JB

JB1

JP1

JP1

IM

0048

JP2

JP4

JP3

JB2

JA2

JP3

JP4

JP4

JP1

JP2

JP1

JP4

IM

0048

JP3

JP3

JA1

JB1

JB

JP2

JA

UPS 3

UPS 2

UPS 1

JA1 + JB1

Next parallel

unit 4, 5, 6

JA3 + JB3

JA2 + JB2

SGS_750_RPA-IM0048_01US

JP1

JP4

JP2

JP2

JA

JP1

JP4

IM

0048

JP3

JP3

Fig. 3.10.2-1 RPA System - Control bus connection


The shield of the control bus cable, connected on JA and JB must be connected to ground with the
appropriate cable clamps fitted on the parallel bus socket.


It is important to place the units in sequence of their assigned number.

A unit number from 1 to 6 is defined by the setting of parameters and displayed on the panel (P1 to P6).
This number is also marked inside and outside the packaging.