Installation of option card – GE Industrial Solutions AF-300 P11_G11 Ethernet Interface User Manual

Page 12

Advertising
background image

Installation

6

Installation of Option Card

Please follow the installation procedure described as follows. Please install or detach the option after turning
off the input power supply of the inverter and confirming the charge lamp (CHARGE or CRG) is gone out.

The shape, the dimensions and the position of the charge lamp of the inverter are different by each capacity.

Keypad

Keypad

Option Unit

Top Cover

PE Line

Inverter Unit

Inverter Unit

Step

1

Step

2

to

4

Charge Lamp

Step 1

Loosen two screws (M4) at a and remove the top cover. Loosen two screws (M3) at b and detach the keypad
panel. (For the 30kW[40HP] and above inverters, the keypad panel can be detached if the front cover is

removed and the screws loosened at b.)

Step 2

Reassemble the top cover, push-in the option unit and secure it with two screws (M3) at c.

Step 3

Secure the keypad panel to the option unit with two screws at b.

Step 4

Connect the ground cable to the PE terminal of the option unit (The rightmost screw terminal, besides the

RJ45 Ethernet connector).

Advertising