GE Industrial Solutions H2007001 G11 Series User Manual
Page 31
Infinity D Power System Installation Guide: +24V Systems
H2007001
Issue 2.0, June 4, 2009
31
Step
Action
Yes, insert each wire into the bottom of the
terminal block according to these diagrams:
R1 R2 R3 R4
L1 L2 L2 L3 L3 L1
L1
L2
200-240Vac Wiring Diagram for 3 Wire
+PE
R1 R2 R3 R4
L1 N L2 N L3 N
L1
N
200-240Vac Wiring Diagram for 3 Wire +
neutral +PE [NON-US ONLY]
R1 R2 R3 R4
L1 L2 L1 L2 L1 L2
L1
L2
200-240Vac Wiring Diagram for 2 Wire +
PE
No, the shelf has a tiered terminal block that can
accept up to 8 AWG wires. Insert each feed wire into
the bottom of the terminal block according to these
diagrams:
R1
L1
R2
L2
R3
L3
R4
L1
R1
L2
R2
L3
R3
L1
R4
L2
200-240Vac Wiring Diagram for 3 Wire +PE
R1
L1
R2
L2
R3
L3
R4
L1
R1
N
R2
N
R3
N
R4
N
200-240Vac Wiring Diagram for 3 Wire + neutral
+PE [NON-US ONLY]
R1
L1
R2
L1
R3
L1
R4
L1
R1
L2
R2
L2
R3
L2
R4
L2
200-240Vac Wiring Diagram for 2 Wire + PE
10.
Make sure all strands are captured in the appropriate wire clamp.
11.
Torque each wire clamp to 5-7 inch· lbs or 0.6-0.8 N·m.
12.
Secure conduit fitting.
13.
Replace AC Termination door.
14.
Tighten Screws to 5-7 inch·lbs or 0.6-0.8 N·m.