GE Industrial Solutions H2007001 G11 Series User Manual

Page 31

Advertising
background image

Infinity D Power System Installation Guide: +24V Systems

H2007001

Issue 2.0, June 4, 2009

31

Step

Action

Yes, insert each wire into the bottom of the
terminal block according to these diagrams:

R1 R2 R3 R4

L1 L2 L2 L3 L3 L1

L1

L2

200-240Vac Wiring Diagram for 3 Wire

+PE

R1 R2 R3 R4

L1 N L2 N L3 N

L1

N

200-240Vac Wiring Diagram for 3 Wire +

neutral +PE [NON-US ONLY]

R1 R2 R3 R4

L1 L2 L1 L2 L1 L2

L1

L2

200-240Vac Wiring Diagram for 2 Wire +

PE

No, the shelf has a tiered terminal block that can
accept up to 8 AWG wires. Insert each feed wire into
the bottom of the terminal block according to these
diagrams:

R1
L1

R2
L2

R3
L3

R4

L1

R1
L2

R2
L3

R3
L1

R4

L2

200-240Vac Wiring Diagram for 3 Wire +PE

R1
L1

R2
L2

R3
L3

R4

L1

R1

N

R2

N

R3

N

R4

N

200-240Vac Wiring Diagram for 3 Wire + neutral

+PE [NON-US ONLY]

R1
L1

R2
L1

R3
L1

R4

L1

R1
L2

R2
L2

R3
L2

R4

L2

200-240Vac Wiring Diagram for 2 Wire + PE

10.

Make sure all strands are captured in the appropriate wire clamp.

11.

Torque each wire clamp to 5-7 inch· lbs or 0.6-0.8 N·m.

12.

Secure conduit fitting.

13.

Replace AC Termination door.

14.

Tighten Screws to 5-7 inch·lbs or 0.6-0.8 N·m.

Advertising