Wire loads served by gmt type fuses – GE Industrial Solutions H2007001 G11 Series User Manual

Page 52

Advertising
background image

Infinity D Power System Installation Guide: +24V Systems

H2007001

Issue 2.0, June 4, 2009

52

Wire Loads served by GMT Type Fuses

Step

Action

1.

Open the Converter or Rectifier System
Module door

2.

Locate Circuit Breaker (CB) mounting
panel.

3.

Install a 6 position GMT type fuse holder
in 2 Circuit Breaker distribution positions
(see picture)

4.

Terminate the return busbar according to
the instructions provided with the GMT
fuse holder kit.

5.

Complete installation and wiring
according to the instructions provided
with the kit.

Open door by pressing here

Return

Termination

points

Advertising