Wire loads served by gmt type fuses – GE Industrial Solutions H2007001 G11 Series User Manual
Page 52
Advertising
Infinity D Power System Installation Guide: +24V Systems
H2007001
Issue 2.0, June 4, 2009
52
Wire Loads served by GMT Type Fuses
Step
Action
1.
Open the Converter or Rectifier System
Module door
2.
Locate Circuit Breaker (CB) mounting
panel.
3.
Install a 6 position GMT type fuse holder
in 2 Circuit Breaker distribution positions
(see picture)
4.
Terminate the return busbar according to
the instructions provided with the GMT
fuse holder kit.
5.
Complete installation and wiring
according to the instructions provided
with the kit.
Open door by pressing here
Return
Termination
points
Advertising