Connect external battery cables – GE Industrial Solutions H2007001 G11 Series User Manual

Page 37

Advertising
background image

Infinity D Power System Installation Guide: +24V Systems

H2007001

Issue 2.0, June 4, 2009

37

Connect External Battery Cables

Battery Cable landings are located at the top of the frame. The return is on your right and
the hot or +24 side is on your left. The extra plastic insulators around the battery bus bars
on the left confirm that this is the electrically hot side with respect to earth.

Step

Action

1.

Loosen the four screws that secure the Battery Hot Termination cover located on the left side of
the Battery Connection Module.

2.

Lift off the Battery Hot Termination Cover to reveal the +24V Battery lead termination bus bar.




Loosen Screws

Advertising