Connect external battery cables – GE Industrial Solutions H2007001 G11 Series User Manual
Page 37
Advertising
Infinity D Power System Installation Guide: +24V Systems
H2007001
Issue 2.0, June 4, 2009
37
Connect External Battery Cables
Battery Cable landings are located at the top of the frame. The return is on your right and
the hot or +24 side is on your left. The extra plastic insulators around the battery bus bars
on the left confirm that this is the electrically hot side with respect to earth.
Step
Action
1.
Loosen the four screws that secure the Battery Hot Termination cover located on the left side of
the Battery Connection Module.
2.
Lift off the Battery Hot Termination Cover to reveal the +24V Battery lead termination bus bar.
Loosen Screws
Advertising