Site Preperation/Installation

SITE PREPARATION

Base Requirements

The minimum base requirement for the ClimaCool chiller is a

level surface which has been checked to ensure that it is capable

of bearing the combined operating weight of the modules (see

page 4) .

Anti-Vibration Mountings

Although the compressors are installed on anti-vibration

mountings, further isolation of the chiller from the structure can

be achieved by installing vibration-eliminating springs or pads

under the base rails on which the chiller will rest . (see page 8 -

Vibration Isolation) .

Service Access

The minimum space required for electrical panel service is 36”

in the front of each module . Allow 24” service clearance in the

back of the module for refrigeration access . Allow a minimum

of 18” of clearance above the module for service . Allow 12” side

clearance of any ClimaCool modular chiller system (see Service

Clearances page 7) . Local building or electrical codes may

require additional clearance .

Draining

When performing standard maintenance procedures such as

flushing heat exchanger, it will be necessary to close off a section

of a module . ClimaCool modular chillers come equipped with

isolation valves for this purpose . Access to a floor drain is helpful

when performing standard maintenance procedures .

INSTALLATION
Assembling Modules

Use of (2) 4” rails (minimum size) is required for ease of

installation . One of the end modules should be chosen as the

reference module and carefully located .

A factory supplied fastener kit is provided for the adjoining

of each module . Each kit contains (2) gaskets, (16) ¾” fully

threaded studs, (32) heavy duty hex nuts, (32) lock washers, and

(32) flat washers .

A ¾”-10 tap should be run through each weld nut located at the

bottom rear chiller header flange of each module . Screw the fully

threaded studs into these four weld nut locations . At all other

flange hole locations, insert fully threaded studs, attach washers,

lock washers, and nuts from the fastener kit .

The gasket should be placed between the first reference module

and the next module . Slide the next module into position while

guiding the fully threaded studs into the flange holes of the next

module . Finally, the washers, lock washers, and nuts are applied

to the other end of the fully threaded studs to securely fasten the

module flanges .

Tighten the flange bolts in a diametrically opposite pattern,

in such a way as to pull the modules together evenly . It will

be necessary to use a ¾” (12 point) box-end wrench when

tightening . As each module is added, the alignment of the whole

package should be confirmed .

Header and Flange Insulation

Chilled water piping is pre-insulated on each module at the

factory with ¾” closed cell foam rubber . After the bolting the

modules together, the installer must apply insulation on site over

the chilled water header connection flanges .

Connecting the Water Piping to Modules

Water piping must be installed in accordance with applicable

codes and standards . Flexible connections and supports should

be installed to prevent load or stress on the module’s flange

connections (see page 11 - Water Piping Configurations) .